← Go back to All Blogs
  • entries
    2,702
  • comments
    131
  • views
    390,115

Subsea7 secures offshore contract for Belinda field’s Trion FPSO from Serica Energy for $150 million

The contract scope includes project management, engineering, procurement, construction and installation (EPCI) of a 5-kilometre 8” production pipeline with a 3” piggy-backed gas lift line and an electro-hydraulic controls (EHC) umbilical.

View the full article

Sign in to follow this  
Followers 0


0 Comments


Recommended Comments

There are no comments to display.

Guest
You are posting as a guest. If you have an account, please sign in.
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.