Zephyr Energy completes drilling operations in Paradox basin onshore Utah
Drilling operations have been completed safely and successfully, with the well drilled to a total depth of 10,290 feet (measured depth). Zephyr’s operations team is now preparing to set a production liner across the Cane Creek reservoir section, after which the Helmerich & Payne Rig 257 will rig down and demobilise from the site.
Sign in to follow this
Followers
0
0 Comments
Recommended Comments
There are no comments to display.