← Go back to All Blogs
  • entries
    3,162
  • comments
    159
  • views
    715,430

Zephyr Energy completes drilling operations in Paradox basin onshore Utah

Drilling operations have been completed safely and successfully, with the well drilled to a total depth of 10,290 feet (measured depth). Zephyr’s operations team is now preparing to set a production liner across the Cane Creek reservoir section, after which the Helmerich & Payne Rig 257 will rig down and demobilise from the site.

View the full article

Sign in to follow this  
Followers 0


0 Comments


Recommended Comments

There are no comments to display.

Guest
You are posting as a guest. If you have an account, please sign in.
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.