Strohm's TCP jumpers installed at Deepwater Sabah project offshore Malaysia
Installed by contractor McDermott on behalf of an international operator, it is the second time the firm’s TCP product has been deployed in Malaysia, after a TCP Flowline and static riser were installed at the shallow water West Lutong field for operator Petronas in 2017.
Sign in to follow this
Followers
0
0 Comments
Recommended Comments
There are no comments to display.