← Go back to All Blogs
  • entries
    2,544
  • comments
    128
  • views
    358,624

About this blog

I started this blog to express what I sense about the highs and lows of the oil realm, while cautiously analysing historical data, taking into account the geo-political development at the time of recording them.

I got into this field, having been a passive observer of fluctuations of crude oil prices and their global consequences for years.

Then, when on the day of Great Oil Crash in April, 2020, I made a decision to make my own blog, with the motto, ‘analysing data that really matters’.

Having come from an academic background in mathematics and physics, I analyse data using my own tools, created with JavaScript and Python, taking my decision on board while making decisions.

My website where I analyse data that really matters

Entries in this blog

 

Shell, Petrobras, partners pioneer “on demand” ocean boom node monitoring project offshore Brazil

Using Sonardyne’s proprietary optical and acoustic communications technologies, and drawing on its extensive experience of seabed monitoring, OD OBN expects to provide a versatile, lower cost, more resilient solution for time-lapse seismic and subsidence monitoring of producing reservoirs with better data and the capacity to be placed on the ocean floor for up to five years without human intervention. View the full article
 

“Highly-anticipated” Zama field offshore Mexico reaches key milestone with DORIS FEED contract award

The FEED work will be based on the scope of the Unit Development Plan approved by the Mexican Hydrocarbon Commission (CNH) last year. It covers the planning of two offshore platforms, 68 km of pipelines and cables as well as a new onshore facility, fully dedicated to the Zama project, located in the Dos Bocas Maritime Terminal, in Paraiso, Tabasco. View the full article
 

SLB, Aker Solutions, Subsea7 secure “sizeable” contract for Equinor’s Troll project offshore Norway

To accelerate field delivery of the subsea tieback to existing infrastructure, SLB OneSubsea will leverage configurable solutions compliant with NCS2017+ for standardized subsea production systems for application in the Norwegian Continental Shelf (NCS). The objective for Troll Phase 3, Stage 2 is to accelerate production from the reservoir equivalent to about 55 Bcmg. View the full article